Warning: Undefined array key "/home/newsvdw7/public_html/wp-content/plugins/wpdiscuz/themes/default" in /home2/newsvdw7/public_html/wp-content/plugins/wpdiscuz/utils/class.WpdiscuzHelper.php on line 455

Warning: Trying to access array offset on value of type null in /home2/newsvdw7/public_html/wp-content/plugins/wpdiscuz/utils/class.WpdiscuzHelper.php on line 455
After Delisle Bridge, 5 ROBs to be repaired by civic authority » NewsViewsNetwork
Connect with us

Mumbai

After Delisle Bridge, 5 ROBs to be repaired by civic authority

Published

on

Read Time: 2 minutes

Five rail over bridges that needed to be repaired at the earliest, will finally be fixed by the Brihanmumbai Municipal Corporation (BMC). Bridges near the Mahalaxmi Railway Station, Curry Road station, Sion station, Dharavi, and Dadar station will be repaired over a span of 18 months . The project will include foot over bridges at the Dadar flower market and at Mahim.
The civic body has estimated the total cost of repair at Rs 17 crores. Sources in the civic body said that none of the bridges will be closed during the repair work and hence, it will not affect traffic movement.
After surveying all 344 bridges in the city, the BMC is granting permits for the repair of as many as 223 bridges in phases. The bridges include foot over bridges (FOBs), flyovers, skywalks, and even rail over bridge (ROBs). Of the 223 bridges, 176 require minor repairs while 47 require serious attention.

The civic administration had earlier tabled the proposal of repairing city’s bridges in the standing committee meeting. An officer from the BMC’s bridge department said, “The major repair work on rail over bridges involves plastering and strengthening, which can be done beneath the bridge. Even if it requires surfacing, it will be done in phases, at night. Traffic movement will, therefore, not be affected.”
In its first phase of repairing, the BMC took up bridges at Mulund, Ghatkopar, Bhandup, Kurla, Dahisar, Borivali, Kandivali, Malad, and Goregaon. The structural auditors have suggested reconstruction of 14 bridges. Of these, three have already been demolished by the civic body. Nearly Rs 3 crore has been spent on the audit, sources said.

Nisha Shiwani hails from the pink city of Jaipur and is a prolific writer. She loves to write on Real Estate/Property, Automobiles, Education, Finance and about the latest developments in the Technology space.

Click to comment
0 0 votes
Article Rating
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments

Warning: Undefined variable $thumbnail_width in /home2/newsvdw7/public_html/wp-content/plugins/category-posts-tabber/cpt-widget.php on line 212

Bridging Points Media

loading...

Samachar Hub

Ukalodisha

Newsletter


Warning: Constant DB_NAME already defined in /home2/newsvdw7/public_html/wp-content/plugins/insert-php-code-snippet/widget.php(67) : eval()'d code on line 7

Warning: Constant DB_USER already defined in /home2/newsvdw7/public_html/wp-content/plugins/insert-php-code-snippet/widget.php(67) : eval()'d code on line 9







































Coupons Universe

Will there again be a Covid outbreak this time in 2025?
VoteResults
0
Would love your thoughts, please comment.x
()
x